[SMM Weekly Manganese Ore Review] Downstream buyers still have a mindset to drive down prices; manganese ore market consolidates

Published: Aug 8, 2025 17:58
As of this Friday, at northern ports: Australian lump ore was priced at 40.7-41.2 yuan/mtu, unchanged from last Friday; South African semi-carbonate ore was priced at 34.9-35.4 yuan/mtu, unchanged from last Friday; Gabonese ore was priced at 39.8-40.6 yuan/mtu, unchanged from last Friday; South African high-iron ore was priced at 29.5-30 yuan/mtu, unchanged from last Friday; South African medium-iron ore was priced at 35.2-35.7 yuan/mtu, unchanged from last Friday. At southern ports: Australian lump ore was priced at 40.2-40.9 yuan/mtu, unchanged from last Friday; South African semi-carbonate ore was priced at 35.5-36 yuan/mtu, unchanged from last Friday; Gabonese ore was priced at 40.3-40.8 yuan/mtu, unchanged from last Friday; South African high-iron ore was priced at 30.6-31.1 yuan/mtu, up 0.65% WoW from last Friday; South African medium-iron ore was priced at 36.6-37.1 yuan/mtu, up 1.38% WoW from last Friday.

As of this Friday, in northern ports: Australian lump ore was priced at 40.7-41.2 yuan/mtu, unchanged from last Friday; South African semi-carbonate ore was priced at 34.9-35.4 yuan/mtu, unchanged from last Friday; Gabonese ore was priced at 39.8-40.6 yuan/mtu, unchanged from last Friday; South African high-iron ore was priced at 29.5-30 yuan/mtu, unchanged from last Friday; and South African medium-iron ore was priced at 35.2-35.7 yuan/mtu, unchanged from last Friday.

In southern ports: Australian lump ore was priced at 40.2-40.9 yuan/mtu, unchanged from last Friday; South African semi-carbonate ore was priced at 35.5-36 yuan/mtu, unchanged from last Friday; Gabonese ore was priced at 40.3-40.8 yuan/mtu, unchanged from last Friday; South African high-iron ore was priced at 30.6-31.1 yuan/mtu, up 0.65% WoW from last Friday; and South African medium-iron ore was priced at 36.6-37.1 yuan/mtu, up 1.38% WoW from last Friday.

In terms of supply, this week, NMT announced its shipping offers for manganese ore to China for September 2025: 36% Min South African semi-carbonate lump ore was priced at $4.05/mtu (up $0.15). It is understood that the corresponding shipments are relatively small, and it is estimated that the impact of this round of price increases on the market spot prices will be limited.

In terms of demand, downstream SiMn alloy plants, affected by the fluctuations in SiMn futures, have seen a slight upward trend in SiMn spot prices, but the increase is limited. There is still a mindset of driving down prices for raw material manganese ore, and they are unwilling to incur high costs.

 Considering multiple factors such as supply and demand, under the mindset game where miners are "unwilling to sell at low prices" and alloy plants are "unwilling to buy at high prices" for manganese ore, the manganese ore market is consolidating. In the short term, most manganese ore prices may remain stable at high levels, while South African ore, due to the concentration of oxidized ore ownership at ports, may enter a phase of temporary stability after a slight upward trend in spot prices.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
17 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
17 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
17 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
17 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
17 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
17 hours ago